Utility / NERC CIP
Rebuilding plant networks around NERC CIP requirements
- Challenge
- Harden the networks at 17 power plants around observed traffic and NERC CIP requirements.
- Engineering
- Rebuilt Check Point firewall rule bases, hardened existing configurations, and introduced new segmentation with Cisco switches. Covered Layer 2, Layer 3, and application-layer security. Staged configurations and tested each cutover during planned plant outages.
- Delivered
- Network designs, validated configurations, tested cutovers, and technical procedures to support NERC CIP requirements.